Skip to main content
Licensed and Fully Insured | California General Building Contractor, License #1136510
Licensed and Fully Insured | California General Building Contractor, License #1136510
ADA accessible parking and entrance upgrade at a California commercial property

ADA Compliance & Accessibility Contractor

Accessibility corrections for commercial property, built to ADA Standards and the California Building Code and documented through sign-off.

Overview

ADA Compliance Construction for California Commercial Property

ConstructCo builds accessibility corrections for offices, retail centers, restaurants, medical buildings and industrial sites. In California, commercial property must meet both the federal ADA Standards and the accessibility chapter of the California Building Code (CBC Chapter 11B), which is stricter in several areas. We build to both.

We are a contractor, not a legal advisor. We do not decide what the law requires of your property; we build the corrections identified by your CASp inspector, consultant, architect or the building department, and we document that they were built correctly.

Scope

What We Correct

Parking and Exterior Routes

  • Accessible parking stalls, access aisles, striping and signage
  • Slopes and cross slopes on walks and routes
  • Curb ramps and detectable warning surfaces
  • Entrance landings, thresholds and door clearances

Entrances and Interiors

  • Door hardware, closer force and automatic door operators
  • Service and transaction counters
  • Interior routes, clearances and turning space
  • Tactile and Braille signage

Restrooms

  • Grab bars, fixture heights and clearances
  • Lavatory knee space and pipe protection
  • Mirrors, dispensers and controls within reach
  • Restroom reconfiguration when the layout cannot comply
Process

Working From Your Report or Letter

Most projects start with a document: a CASp report, an accessibility survey, a demand letter, a settlement agreement or a correction notice. We review it with you, confirm each item in the field, price the work and build it in the order that reduces your exposure soonest. When work is done, you get photos, measurements and inspection records for each item.

Parking

ADA Parking Lot Compliance

Parking is often the first item in a report because it is visible from the street. Common issues are missing van-accessible stalls, access aisles that are too narrow or too steep, faded striping and signs at the wrong height. We rebuild slopes, restripe and reinstall signage, and phase the work so the lot stays usable.

Path of Travel

Path of Travel Upgrades During Tenant Improvements

In California, alterations to a building can require upgrades to the path of travel that serves the altered area, including parking, entrances, restrooms and drinking fountains. We identify these during design of your tenant improvement so they are in the budget, not discovered at plan check.

Occupied Buildings

Building While You Stay Open

Accessibility work usually happens at entrances, parking and restrooms that people are using. We set temporary accessible routes, schedule disruptive work outside business hours and keep at least one restroom available where we can.

Questions

ADA Compliance Questions

We build the corrections a CASp report identifies. We coordinate with Certified Access Specialists and consultants and can recommend you engage one if you do not have a report.

Small items such as signage and hardware can take days. Parking and restroom reconfigurations take longer, especially if a permit is required. We give you a schedule once we have reviewed the report.

Many do, especially restroom reconfigurations, ramps and parking changes. We confirm permit needs with the jurisdiction and handle the submission.

Related services

ADA Upgrades & Compliance

SB 326 & SB 721 Compliance Construction

Balcony, walkway and stair repairs that close SB 326 and SB 721 inspection findings, with permits and documentation…

View service (SB 326 & SB 721 Compliance Construction)

Send Us Your Report

Send your CASp report, accessibility survey, demand letter or correction notice. Expect a reply from a project manager within one business day.